Uncategorized

2019 Safety Symposium

Posted on

Newton Group Ltd. held its Safety Symposium at the Frank Hasenfratz Centre for Excellence in Manufacturing on Friday, February 8th. The purpose of the Safety Symposium was to clearly communicate the importance of workplace safety to allow employees to perform cohesively and reduce accidents and issues. This year we welcomed Daniel Wong from WeirFoulds as […]

Uncategorized

Safety Meeting 2018

Posted on

On Friday, March 23rd, Newton Group Ltd. held its Annual All Staff Safety Meeting. We were pleased to welcome Rob Ellis (Founder, MySafeWork and member of the League of Champions), Andrea George (Program Coordinator, MySafeWork), Clive Thurston (President, OGCA and member of the League of Champions), and David Frame (Director of Government Relations, OGCA) as special guests to this […]

Parking Structures

Wilson Street Parkade

Posted on

Newton Group Ltd. has started construction to design and build a new seven (7) level parking structure on Wilson Street in Downtown Guelph. The new parkade will park a minimum of 495 cars and include ancillary spaces for bike storage, IT, public washrooms (roughed in), a feature lobby and electric vehicle charging stations. Construction will […]

Uncategorized

Wilson Street Parkade Groundbreaking

Posted on

The Groundbreaking event for the Wilson Street Parkade was hosted by the City of Guelph on February 22nd at City Hall. The event celebrated the construction of the first parkade to be built in Guelph in over 30 years. Remarks were given from Mayor Cam Guthrie, City of Guelph CAO Derrick Thomson and Downtown Guelph […]

Uncategorized

Q&A: How long does it take to build a parking structure?

Posted on

While the average conventional poured-in-place concrete parking structure can take anywhere from 18 to 24 months (and sometimes even longer) to build, our prefabricated CANADACAR Parking Structure System can be constructed in half the time. The unique CANADACAR Parking Structure System offers a faster build due to the production of the pre-engineered modules in our […]

Uncategorized

Construction set to begin on Wilson Street Parkade

Posted on

We are just over one week away until construction is set to begin on the Wilson Street Parkade in Downtown Guelph! As of 4pm on Sunday, February 4th, the existing parking lot on Wilson Street will be closed as we work with the City to prepare for construction. The new parkade will provide 496 parking […]

Parking Structures

Humber College North Campus Parking Garage

Posted on

Newton Group is the Design-Builder of a new state-of-the-art seven (7) level, 1000 vehicle parking garage at Humber College in Toronto, Ontario. The building is located at 205 Humber College Blvd and will be owned by Humber College Institute of Technology & Advanced Learning. Newton Group Ltd. is providing turnkey design-build services including in-house engineering […]

Parking Structures

McLaren Technologies Parking Structure

Posted on

Newton Group Ltd. was selected as the Design+Builder for this new 150 space, two level above grade parking structure, including a connecting bridge. McLaren Performance Technologies also required the construction of an Engineering, Research, Development and Sales Centre. The project involved demolition of an existing building and selective demolition in a second building, all conceptual and […]

Parking Structures

Heffner Toyota Vehicle Storage Building

Posted on

Newton Group Ltd. manufactured and constructed this 248 space CANADACAR Parking Structure under a design-build contract. The 3 storey parking structure is an open air structure and therefore requires no ventilation. Because of the free span design, vehicle storage is unimpeded by any giant concrete columns within the building, therefore making it easier and safer […]