Bridges

Dean Lake Road Bridge Rehabilitation

Posted on

Located in Iron Bridge, Ontario, this Design+Build bridge project located in Iron Bridge, Ontario featured:Reduced dead load, increasing live load from 5t to 28tIncreased durability from a wood deck to fibreglass deckWater blasting and painting the steel bridgeThree 36m x 4m decks were installed and Newton Bridge Solutions designed and built the three fibreglass composite panels for […]

Bridges

McLaren Performance Technologies Pedestrian Bridge

Posted on

The 9’ wide prefabricated bridge spans 55’ above a parking lot and fire route access.  The bridge connects a new office building with a parking structure, also constructed by Newton Group Ltd. The bridge consists of our proprietary ultra-high performance concrete precast deck plates, grouted onto two galvanized warren trusses and topped off with a […]

Bridges

Nipissing Road Bridge Rehabilitation

Posted on

Newton Bridge Solutions was entrusted with the rehabilitation of the 78m bridge span over water in Markstay-Warren, Ontario.  This undertaking included the removal of 50m of approach concrete and replacing it with new.  The project consisted of three bridges with an approach bridge located at each end using steel beams which were sitting on wooden […]

Bridges

Shellard Road Bridge Rehabilitation

Posted on

Newton Bridge Solutions was entrusted with the rehabilitation of the Shellard Road Bridge over Mill Creek in Cambridge, Ontario. The project was completed over a two month period. The narrow 2-lane concrete bridge and steel substructure were removed, and partial reconstruction to the top of the abutments and wing walls was completed. Installation of a […]