Newton Bridge was the Design-Builder for this bridge project.

mental-health-and-addiction-hospital.jpg

Located in Iron Bridge, Ontario, this Design+Build bridge project located in Iron Bridge, Ontario featured: Reduced dead load, increasing live load from 5t to 28t Increased durability from a wood deck to fibreglass deck Water blasting and painting the steel bridge Three 36m x 4m decks were installed and Newton Bridge Solutions designed and built the three fibreglass composite panels for each span. This bridge was demolished in October and reopened to the public in February to the satisfaction of the client.