Project Name:
Completion Date: October 2019
Contract Type: Design-Build
Number of Spaces: 496
Materials: Steel + Precast Concrete
Structural System: CANADACAR System
Gross Floor Area: 153,900 sf
The project also included the demolition of the pedestrian bridge over Norfolk Street, replacing it with the new Veterans Memorial Bridge, manufactured and installed by Newton Group. The backlit bridge has a laser cut design of poppies subtly integrated along the side to commemorate veterans of Canada.
To meet the City of Guelph’s renewable energy targets the facility is Net-Zero with a 190 kW array of over 500 roof mounted solar panels. The generated power will supply the Electric Vehicle charging stations, lights, security and parking access and revenue control equipment.
General Contractor: Newton Group Ltd.
Engineer: Tacoma Engineers Inc.
Architect: James Fryett Architect Inc.
Mechanical: MNE Engineers
Electrical: MNE Engineers
41 Massey Road
Guelph Ontario, N1H 7M6
Phone: 519-822-5281
Fax: 519-822-6159
Email: Email
2169 Hendersonville Rd
Arden, NC 28704
Phone: 519-822-5281
Fax: 519-822-6159
Email: Email
© 2024 All Rights Reserved.