KiwiNewton Group Of Companies.png

PLAN  |  DESIGN  |  PREFAB  |  BUILD

  • Home

  • Projects

    • Our Projects
    • Awards
    • Testimonials
  • Building Systems

    • Building System Method
    • Parking Structure System
    • Condo/Commercial
  • Sustainability

    • Net-Zero Buildings
    • Newton Solar
    • EV Charging Station Locator
  • Articles

  • About Us

    • About Us
    • The Kiwi
    • Our Services
    • Emergency Services
    • Contact Us
  • Careers

  • More

    Use tab to navigate through the menu items.

    Turn-key solutions for all of your development needs

    (519) 822-5281

    Locations

    Canada

    United States

    Open Positions for Essential Construction Projects: Careers Page

    • All Posts
    • Parking Structures
    • Auto-Dealers
    • Healthcare
    • Company News
    • Residential
    • Retirement Homes
    • Articles
    • Condo/Commercial
    Search
    Bringing it all together - the KiwiCondo/Commercial Building System comes to life.
    • Nov 29, 2021
    • 2 min

    Bringing it all together - the KiwiCondo/Commercial Building System comes to life.

    When it comes to building construction, a new trend is sweeping the industry, changing how we look at construction called Pre-assembly....
    Timing is everything – A review of the NAMHAF Facility Parking Structure Project
    • Sep 30, 2021
    • 2 min

    Timing is everything – A review of the NAMHAF Facility Parking Structure Project

    When timing is everything, count on Newton Group Ltd. to deliver! Check out our latest update on the NAMAHF parking structure project.
    Kiwi Newton Group breaking the mould with advancements in precast concrete
    • Jun 19, 2021
    • 1 min

    Kiwi Newton Group breaking the mould with advancements in precast concrete

    Kiwi Newton is excited to have Green Building + Architecture feature Kiwi Newton Construction in the Summer Edition. The article outlines...
    How long does it take to build a parking structure?
    • Mar 3, 2020
    • 1 min

    How long does it take to build a parking structure?

    While the average conventional poured-in-place concrete parking structure can take anywhere from 18 to 24 months (and sometimes even longer)
    • Nov 1, 2016
    • 1 min

    Newton Group to construct Wilson St. Parkade in Downtown Guelph

    We are thrilled to announce that Newton Group Ltd. has been awarded a $20.4M design-build contract to construct the new Wilson Street...
    Pushing the Envelope in Design Build Delivery in Ontario
    • Jan 10, 2016
    • 1 min

    Pushing the Envelope in Design Build Delivery in Ontario

    Newton Group Ltd. is honoured to be highlighted in CA Business Executive Magazine. A big thank you to Molly Shaw, Sean O'Reilly and...
    • Mar 21, 2013
    • 1 min

    How is climate change affecting the construction industry?

    More storms; more extreme temperatures; hotter summers and colder winters. Weather always has a bearing on construction. Poor weather...
    How safe is your parking structure?
    • Jan 16, 2013
    • 1 min

    How safe is your parking structure?

    You’ve done everything you could–painted the walls a light colour to reflect light into the spaces; added more lighting; installed CCTVs....
    1
    2
    ffca1db1c4793f1bb830f336324a7a00.png
    GreyMemberx1_4.png

    Contact  |  Careers  |  About Us  | Projects

    canada.png
    • Instagram
    • LinkedIn Social Icon
    • Facebook Social Icon
    • Twitter Social Icon

    1-519-822-5281 

    marketing@kiwinewton.com 

    ​

    © 2021 | Kiwi Newton Group | All rights reserved.

    logo_ihsa-cor-certified-large.png